Project Highlights

  • Classification: EPCC
  • Year: 2022-2021
  • Location: SIBA
  • Client: Kuwait Energy
EPC of Waste Collection Area of SIBA Gas Field

Engineering, Procurement, and Construction (EPCC) project for a specialized waste collection area at SIBA Gas Field for Kuwait Energy.

Project overview

A turnkey EPCC project delivered for Kuwait Energy (2021–2022), establishing a fully compliant waste management facility within the SIBA field.

  • Full engineering design and procurement.
  • Construction of containment and separation areas.
  • Environmental compliance integration.

Challenges & solutions

Ensuring zero-leakage containment for hazardous waste required specialized lining systems and rigorous quality testing.